> UPGRADE BOARD
OPERATORS MANUAL
INSTALLATION USING ZERo.B ADVANCED SET-UP WARRANTY INFO
INSTALLING YOUR ZERO.B BOARD
Ensure that your Eclipseblade frame is powered down and de-gassed. Remove the barrel and loader to make the frame easier to work on.
Remove the 9 volt battery (if present), and carefully unplug the cocking solenoid from the top port on your PCB, the sear solenoid from the middle port on your PCB and the Breech sensor from the bottom port on your PCB. Using a 5/64th inch (2mm) hex key undo the three PCB screws that are holding your original circuit board into the frame. Remove the old PCB being careful not to loose the 3 pushbutton caps in the rear of the frame.
Ensure that the three pushbutton caps are correctly positioned, and position the Zero-B board into the frame. Loosely screw in the three PCB screws and holding the middle pushbutton, tighten
Release the middle pushbutton, and manually test all three push buttons, to ensure that the Zero-B board is in the correct position. Reconnect the cocking solenoid to the top port on your Zero-B PCB, the sear solenoid to the middle port on your Zero-B PCB and the Breech sensor to the bottom port on your Zero-B PCB. Install a fresh 9 volt battery and turn the Zero B frame on in exactly the same manner as your old Eclipseblade PCB. Ensure that the trigger activates the PCB when pulled, and if not make the necessary adjustments (see setting the trigger in either the Eclipseblade or the E2 manual). Screw in the three rubber grip screws on the right hand side of your frame using the 5/64th inch hex key. Congratulations! You have now installed your Zero-B board.
installation
Remove the three grip rubber grip screws from the right hand side of the Eclipseblade grip frame and bend the rubber grip out of the way.
all three screws to correctly position the Zero-B board.
Extracted from the PDF. Read the full manual above, or download it.